Weekly progress diary from beginning of March 2005 The old wooden stairs in the bottom station installed in 1941/2 were getting past their best. They had uneven treads and some wood was rotten, but we had always maded sure all the treads were well supported. We had propped them up for years so that they would be safe to walk up. We thought we had better replace the steps and the floor over the water trough to make sure everything was tidy and safe. Work did not affect the original entrance to get onto the cars except for supporting it better. We took two and a half days with the help of eight volunteers.
windows
new steps
Propping under the stairs
new steps
A safe gangway to get to the steps over the trough using scaffolding planks but not pretty
new steps
Mike, Alan, Maggie and Dave cut all the treads to be able to dismantle the steps.
new steps
Ready to remove the side panels and use them as a pattern
new steps
We decided to replace the joists over the trough too. Steph, Alan and Dave overlooking
new steps
Steph, Tom, Maggie and Chris treated the new steps and treads
new steps
Alan sweeping out the dusty trough with Mike looking on
new steps
Mike adding the new joists and making sure they are level
new steps
new treads and supports all treated and ready to install
new steps
Tom treating the top landing joists ready to put some new floorboards down
new steps
Meantime John and Chris were making the new side supports. We changed the angle from 47 degrees to 45 degrees after much scratching of heads. We also had to redesign the ends to reflect the new floor
new steps
This is the last remnants of the original floor over the trough! The public were prevented from walking over this right from the beginning as they went through the hole but we were surpised to see how bad it was. We can now use this area for a display area
new steps
John and Mike trying out the new side to get the top and bottom profiles correct
new steps
New floorboards in position
new steps
Wherever one looked there was someone doing something! Brilliant
new steps
The first side being fixed in
new steps
and level
new steps
the other side then went in
new steps
the first step was level too!
new steps
Demolition Dave put in the rest of the steps
new steps
Looks good and safe