The existing timber kerbs and their mastic asphalt covering were removed, along with the cast iron drainage gullies and the timber splashboards. A new drainage channel was installed, with narrow glass-fibre reinforced polymer (GRP) splashboards and extruded asphalt kerbs on both sides of the roadway. The roadway was also resurfaced, and some of the timber replaced (last done 50 years ago). Work on the £650,000 project started in July 2008 and finished in December 2008.