2009 Suspension Bridge maintenance

4 October 09: More maintenance- this time by climbers on the chains

5 April 09: Bristol’s Clifton Suspension Bridge was closed on Saturday evening after a crack was found in one of its metal hanging rods. Dorothea Restorations came to the rescue.